Our dredging jobs have been carried out at
different locations mainly in Bayelsa state
for renowned engineering and construction
companies, and the jobs have been handled
with keen interest and determination.
We do
Step wise project planning and execution
dredging
Detailed
Echo Sounding/ Hydrographic Survey
Land Acquisition/ Site Preparation Activity.
Bond Wall Preparation.
Preliminary Site Survey to Ascertain Base
Levels (Contractor and Client Surveyors).
DREDGER MOBILIZATION TO SITE/ PIPE COUPLING.
Return water channel preparation (water
boss) and final site status
appraisal.
Commencement of dredging and stuck pilling
operation.
Regular joint survey activity on site.
Completion of desired stuck pilling.
Demobilization from site.